About company

About Us

GSR Energy is an investment group that focuses on investments in the latest technologies in urban infrastructure development, including the production, supply and sales of thermal and electrical energy, water supply and disposal systems for consumers of the industrial site of Kolpino District .

110 MW

Electric capacity

555 MW

Heat capacity

43 thsd / m3

Capacity of the Central effluent facilities

110 MW

Electric capacity

555 MW

Heat capacity

43 thsd / m3

Capacity of the Central effluent facilities

Completed projects

2014

Putting into operation new combined cycle gas-turbine thermal power plant (CCGT-TPP) with the combined electrical and thermal energy production of 110 MW / 77 Gcal/h, and capacity factor of more than 80%. In-parallel withdrawal of three old boilers with the total output of 150 Gcal/h;

2017-2019

Decommissioning the old generation complex.

2019

Putting into operation Steam Boiler with the steam output of 48 t/h.

2020

The modernization of the VK-2 water boiler station with the output of 400 Gcal/h.

2021

Modernization of the water disposal system of GSR Vodokanal JSC. In February, a sewage pumping station was put into operation to return wastewater from the territory of the CSP to the treatment facilities of the CSP.

2021

The first group of sand traps (4 pcs.) of the CEF GSR Vodokanal JSC was put into operation after reconstruction.

2022

The technical re-equipment of the production facilities of GSR Vodokanal JSC was completed and a sludge dewatering station was put into operation.

2023-2026

Реализация II этапа модернизации водогрейной котельной ВК-2