Construction work at the CCGT CHPP

April 1, 2012
01.04.2012

Department of GTU

Completed work on the installation of load-bearing metal structures of the frame. Works are being carried out on the installation of metal structures for fastening enclosing structures

Department of VPU

Completed work on the installation of load-bearing metal structures of the frame

Works are being carried out on the installation of metal structures for fastening enclosing structures and bench sandwich panels

Waste heat boiler

Works on installation and thermal insulation of sheathing are being carried out

Installation of the main equipment

Steam turbine – the generator and the lower part of the steam turbine cylinder were installed on the upper power plate of the foundation, the steam turbine condenser was installed in its normal position.

Completed installation of an overhead crane in the gas turbine shutdown department

Other news

May 9, 2023

Congratulations on Victory Day

Dear Colleagues!   Today we celebrate a great memorable day - Victory Day! On this holida...

May 1, 2023

Happy May Day!

Dear Colleagues, Congratulations on May 1st! This day is the main holiday of spring and symboliz...

April 26, 2023

Hot water quality improvement plan 2023

Plan of measures to improve the quality of hot water supply from heat sources of GSR Energy CCGT-TPP...