Department of GTU
Completed work on the installation of load-bearing metal structures of the frame. Works are being carried out on the installation of metal structures for fastening enclosing structures
Department of VPU
Completed work on the installation of load-bearing metal structures of the frame
Waste heat boiler
Works on installation and thermal insulation of sheathing are being carried out
Installation of the main equipment
Steam turbine – the generator and the lower part of the steam turbine cylinder were installed on the upper power plate of the foundation, the steam turbine condenser was installed in its normal position.