Construction progress as of March 22, 2013

March 22, 2013
22.03.2013

Information about the events that took place at the construction site of the CHP CCGT “GSR Energo” in the period from 03/15/2013 to 03/22/2013:

  1. The construction of all foundations of the off-site overpass of technological pipelines was completed (with the exception of support No. 82).
  2. The installation of tank No. 1 of demineralized water has been completed.