Construction progress as of October 19, 2012

October 19, 2012
19.10.2012

Information about the events that took place at the construction site of the CHP CCGT “GSR Energo” from 10/12/2012 to 10/18/2012:

  1. BCP installation started (gas treatment point)
  2. Started installation of APCS panels
  3. The installation of electrical wires of the KVL circuit with the passage through the Oktyabrskaya railway